Synchronizing production scheduling with resources allocation for precast components in a multi-agent system environment
Zhaojing Wang,Hao Hu,J. Gong,Xiaoping Ma
2018 · DOI: 10.1016/J.JMSY.2018.09.004
Journal of manufacturing systems · 34 Citations
TLDR
A multi-agent based precast production planning model to synchronize the production scheduling and resource allocation and the heuristic algorithm is presented to integrate the optimization techniques with the competing goals shown in a multi- agent system.
Cited Papers
Citing Papers
