UPDF AI

Production Scheduling for Flexible Flowshop using Genetic Algorithms

Boonchuay Srithammasak,Weerapan Sae-Dan

2013
0 Citations

TLDR

The results showed that the production scheduling with the genetic method enabled to reduce the production time from 14 days into 12.4 days, or 11.42 percent, and the time analysis of the program processing had the significant relation to the number of the jobs, and of the search model.

Cited Papers
Citing Papers