Precast production scheduling with genetic algorithms

W. Chan,H. Hu

2000 · DOI: 10.1109/CEC.2000.870768
8 Citations

TLDR

A flow shop sequencing model (FSSM) that incorporates actual constraints encountered in practice is proposed for the difficult case of specialized precast production scheduling using a genetic algorithm (GA), showing that the GA is competitive, if not better than heuristic rules in discovering a set of good solutions.