UPDF AI

Multiobjective Construction Schedule Optimization Using Modified Niched Pareto Genetic Algorithm

K. Kim,J. Walewski,Y. Cho

2016 · DOI: 10.1061/(ASCE)ME.1943-5479.0000374
39 Citations

TLDR

An optimization approach is presented that enables a simultaneous search for an optimal construction schedule in terms of three objectives: minimization of construction duration, cost, and resource fluctuation and a new data structure is proposed that can compute the performances of solutions in Terms of all the objectives at the same time.