Minimizing the maximum lateness on a single machine with raw material constraints by branch-and-cut
Minimizing the maximum lateness on a single machine with raw material constraints by branch-and-cut
P. Györgyi,T. Kis
TLDR
An exact method for solving the machine scheduling with raw material constraints with the maximum lateness objective based on mathematical programming is proposed, the main contribution being a set of new cutting planes that can be used to accelerate a MIP solver.
Abstract
Abstract Machine scheduling with raw material constraints has a great practical potential, as it is solved by ad hoc methods in practice in several manufacturing and logistic environments. In this paper we propose an exact method for solving this problem with the maximum lateness objective based on mathematical programming, our main contribution being a set of new cutting planes that can be used to accelerate a MIP solver. We report on computational results on a wide set of instances.
