Minimization of maximum lateness in an m-machine permutation flow shop with a general exponential learning effect
Minimization of maximum lateness in an m-machine permutation flow shop with a general exponential learning effect
Hongyu L. He
2016 · DOI: 10.1016/j.cie.2016.04.010
Computers & industrial engineering · 17 Citations
TLDR
To form a hybrid solution framework, several heuristics, a branch-and-bound algorithm and a new Nested-Partition-based solution approach are proposed to reduce the searching region and to provide guidance on the lower bound.
