Implementing earned value management using bridge information modeling
Implementing earned value management using bridge information modeling
M. Marzouk,Mohamed Hisham
2014 · DOI: 10.1007/S12205-014-0455-9
63 Citations
TLDR
A BIM-based cost estimation application is presented which is capable to carry out approximate cost estimate; and detailed cost estimate and is designed in a flexible manner to be used with default values, or user defined values.
