Delay Analysis for Wireless Fading Channels with Finite Blocklength Channel Coding
Delay Analysis for Wireless Fading Channels with Finite Blocklength Channel Coding
Sebastian Schiessl,J. Gross,H. Al-Zubaidy
2015 · DOI: 10.1145/2811587.2811596
International Conference on Modeling, Analysis and Simulation of Wireless and Mobile Systems · 114 Citations
TLDR
It is shown that the Shannon capacity model significantly overestimates the delay performance for low-latency M2M applications, which would lead to insufficient resource allocations.
