Abstract

With the increasing integration of renewable energy, virtual power plants (VPPs) have emerged as key market participants by aggregating distributed energy resources. However, their involvement in electricity markets is increasingly challenged by two major uncertainties: price volatility and the intermittency of renewable generation. This study presents the first application of Information Gap Decision Theory (IGDT) within a two-stage cooperative scheduling framework for VPPs. A novel bidding strategy model is proposed, incorporating both robust and opportunistic optimization methods to explicitly account for decision-making behaviors under different risk preferences. In the day-ahead stage, a risk-responsive bidding mechanism is designed to address price uncertainty. In the real-time stage, the coordinated dispatch of micro gas turbines, energy storage systems, and flexible loads is employed to minimize adjustment costs arising from wind and solar forecast deviations. A case study using spot market data from Shandong Province, China, shows that the proposed model not only achieves an effective balance between risk and return but also significantly improves renewable energy integration and system flexibility. This work introduces a new modeling paradigm and a practical optimization tool for precision trading under uncertainty, offering both theoretical and methodological contributions to the coordinated operation of flexible resources and the design of electricity market mechanisms.

Cited Papers
Citing Papers