A multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project
A multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project
M. Zareei,H. Hassan-pour
2015 · DOI: 10.22059/IJMS.2015.55006
10 Citations
TLDR
A mathematical model is presented for the given problem and three evolutionary algorithms; NSGA-II, MOSA and MOPSO are applied to find the set of Pareto solutions for this multi-objective scheduling problem with positive and negative cash flows.