Evaluation and Reactivation Strategy of Shut-In Wells Due to High Water Cut to Improve Oil Production in Bayu Field: Case Study of Bayu-N3 Well
Evaluation and Reactivation Strategy of Shut-In Wells Due to High Water Cut to Improve Oil Production in Bayu Field: Case Study of Bayu-N3 Well
Dedy Kristanto,D. Rukmana,Agus Amperianto,Windyanesha Paradhita
2022 · DOI: 10.11648/j.ogce.20221001.13
International Journal of Oil Gas and Coal Engineering · 1 Citations
